Friday, October 24, 2008

Photo Updates

After writing so much it's time to see some updates on the work done this week. I will take photo on the aircon trunking and post them this weekend. :)




The SCV cable had been extended out from the Household shelter. Additional light switches had been catered and power point had been extended for the TV Console. Sebasten said that the design for the TV Console will be changed due to the power point trunking.




The ceiling light points were done. The center points are for the downlights and the others at the 2 end were the cove light points.






Extra power point for refrigerator, hood and light switch were done up on the left picture and dining area light point was done up on the right picture.

CityGas will be here to do the gas piping on this Friday.