Showing posts with label flooring. Show all posts
Showing posts with label flooring. Show all posts

Sunday, November 2, 2008

False Ceiling and Bedroom Floorboard Done!!




The false ceiling at the living area is done. It is a capital 'I' shape with xiaofang in the right picture.



The false ceiling over the dining area.




The Bali Chengal laminated floorboard in the Master Bedroom.




The right picture shows floorboard in the Bedroom 3 and the left picture shows floorboard in the Bedroom 2.


The walls in the dining area are being ultra compound plastered.




Box up are done at the kitchen entrance area and the beam. The slot is done for the fixed glass panel.



Box up is done at the Master Bedroom to cover the aircon trunking.



Lightings that we bought at Chelsea are delivered. Hee haven't got time to check the conditions.

Saturday, October 25, 2008

Aircon trunking and gas piping

The aircon trunking and City Gas piping had been done up!!





There will be more trunking exposed in Bedroom 2. The higher one is the refrigerant piping and the one above the door frame is the drainage piping. The door will need to be chamfered a bit at the top so that the door can closed properly. :)





This is the position of the fan coil unit in the bedroom 3.





The position of the fan coil unit in the master bedroom is shown above. The ugly trunking will be boxed up in the later part of the renovation.




This is where the refrigerant and drainage piping to and from the bedroom 2 and 3. The refrigerant is at the ceiling and go into the toilet false ceiling. The drainage is run beside the toilet door frame and into the toilet.




The drainage from the bedrooms run behind the basin and toilet bowl and enter the sewage.


The refrigerant pipe from the outdoor unit to the toilet false ceiling.





The City Gas people extended the gas piping to the position of our hob.





My nephew and niece are holding onto our bedrooms floor board from supreme. It is Bali Chengal!!

Sunday, October 12, 2008

Living Room's flooring almost completed!!

Most of the living room floor had been done up including the household shelter. What's left is the joining between the living and dining area. Sealant need to be applied to the joint area and the flooring is done.


Sebasten will be aliasing with HDB to let them proceed to do the rooms cement screeding. We had chosen the supreme laminate on Friday and it is Bali Chengal! From the supreme website, it said that the Executive range of laminate flooring comes with Superior Water Resistant Quality Hardwood HDF. Not only it is tougher, but the Executive range is also more eclectic with an extensive range of colours to choose from.


Some defects to note are the flooring along the passageway had been done up too high and resulted in the main bedroom and 2nd bedroom doors cannot be closed... :( Going to complain to Sebasten and let him know the defects.



The cabinet base had been partially done up on the right side of the kitchen. Surprised that Sebasten managed to get really similar floor tiles to match the original floor tiles. HDB said that the tiles are obsoleted, so I guess that is the power of renovation company. ;) Hopefully the base will be done on both side when we come again next weekend.



The feature wall had been constructed and luckily it din blocked much of the sunlight and darkened the room. Xiao fang worried that after the cabinets are done up then it will be dark. But my take is not really as the cabinets are not stretched to the windows and moreover the cabinet color will be white :P or maybe off white.



The feature wall will be installed with tinted glass mirror and there will be a 'L' shaped tiled border. The pattern of the tile is shown above. Like this design better as compared to the full black with glitter tile. A bit sad as the floor is tilted to facilitate the water flow, the tiles at the bottom of the feature wall will be cut and the circles will not be full. :( Nevertheless, I guess it will be covered by the dining table. :P