Saturday, October 25, 2008
Aircon trunking and gas piping
Friday, October 24, 2008
Photo Updates
After writing so much it's time to see some updates on the work done this week. I will take photo on the aircon trunking and post them this weekend. :)
The ceiling light points were done. The center points are for the downlights and the others at the 2 end were the cove light points.
Extra power point for refrigerator, hood and light switch were done up on the left picture and dining area light point was done up on the right picture.
Thursday, October 23, 2008
Spending Spree....
We nearly give up on having a System 3 if Daniel's plan really took off. I guess in the end every thing work out well. :)
After waiting for 2 hrs++ for Miss xiaofang who goes for her interview with a job agency and claimed that it will be chop chop, we proceeded to Chelsea Lighting with Sebasten (he is late too!!) to get our lighting. When he called me at 1pm to inform me that he will be late due to site survey, he also told me that Chelsea Lighting was previously known as Chuan Seng and told me to look for a lady called Amy. This lady Amy was the one who served us on Monday when we popped by to look at their lighting. Sebasten said that she used to work in a Lighting shop in IMM before the shop made way for Daiso. I guess after many years in the renovation industry, everyone knows each other.
We got 7 lights which total up to S$931. The master bedroom light cost the most ($321) but it come with a remote which can toggle the lights in 3 different modes. Mode 1 on 2 of the 4 bulbs (warm light), Mode 2 on the other 2 of the 4 bulbs (daylight) and Mode 3 on the 4 bulbs. Interesting!! we also managed to get a matching light for our master bedroom entrance and Amy will modify it from a ceiling to a hang light.
In the end, I did not get the light that I fancy for the dining area but Amy is able to modify it to use it as a passageway light. So for dining, we chose a round aluminium ball like light which we think the diffuse lighting effect will be good. The other kitchen light is a rectangle with aluminium skirting to match the dining area hang light.
To cut the budget, we got normal glass round lights for the 2 other bedrooms. 32W should be sufficient to light up the 2 small rooms. :P
Due to no empty white lot, Sebasten parked on a red lot when we arrived at Chelsea. Luckily, the human alarm system was good and Sebasten managed to siam the ticket aunties. If not, we will feel pai sei to let him kena 'san man'. His advice on the lighting was good and matched our liking.
After getting the lights, it was already 5:30pm. He drove us to IMM to take a look at the bed frame at OM. At OM, we met Andy the 4th time and surprisingly he knows Sebasten and Sebasten knows Michael (from Henderson OM). We both like the bed frame and Xiaofang, not wanting to make the decision, ask me to decide to get it or not. Well having done some research, I feel the price ($799 -10% + 7% GST) is ok and the design is sleek, nice and structure is firm and steady. I decided to get it and together with the side table (Xiaofang wants one :P).
A grand total of S$2931 damage to our pockets...
After spending so much, we went back to Sebasten office and managed to settle on the color and internal and external design of kitchen cabinets, shoe cabinet, wardrobe and feature wall/console. We had also selected our living room and bedroom 2 color which is Morning Dew, master bedroom colors which are Lavender Mist and Kashmir, bedroom 3 colors which are Cool Lime and Morning Dew and lastly kitchen color which is Bisque.
Our renovation will be going at 120km/h that what Sebasten said. :P
Monday, October 20, 2008
$100 and Lightings
Hopefully the screeding are done properly.
Tonight we went to Jurong East to take a look on the lightings. We went to Pan Tech and Chelsea Lighting. Both have a wide range of dining, living, kitchen and bedroom lights. We saw a nice hanging light for the dining and we think we will go there and get our lightings. :)
Creation guys will be coming on thursday to do up the aircon trunking and we will be poorer cos we got to make the 1st payment. :P
Sunday, October 19, 2008
Week 3 of Renovation
The walls had been cement plastered and the wall had been touched up. The cement plaster was incomplete and more touch up will be expected.
The base of the refrigerator, washing machine and cabinet had been completed. Hmmm.. I need a leveling tool to check the level of the base. Hopefully it is not expensive to buy. :)
The base of the pantry had been done too. Next week I will be meeting the air con specialist to talk about how the trunking will go around the rooms. Also, Sebasten will be meeting us to talk about the cabinet and buying of lights. Electrical works will be starting next week and I guess the flooring of the rooms may be done up too and and not to forget the ceiling works.
Sunday, October 12, 2008
Living Room's flooring almost completed!!
The feature wall will be installed with tinted glass mirror and there will be a 'L' shaped tiled border. The pattern of the tile is shown above. Like this design better as compared to the full black with glitter tile. A bit sad as the floor is tilted to facilitate the water flow, the tiles at the bottom of the feature wall will be cut and the circles will not be full. :( Nevertheless, I guess it will be covered by the dining table. :P
Wednesday, October 8, 2008
Arrival of Materials
The homogeneous titles... guess what colour?
Bricks for our kitchen feature wall.
Electrical works done at the Divider wall between living room and kitchen.
The bottom electrical points had been terminated and the top electrical points had been shifted to the left. The shifting are mainly for refrigerator and hood power point and the lighting switch.
Some piping and drainage done.