Saturday, November 22, 2008

Kitchen Cabinets

The kitchen cabinets are up. Currently waiting for the granite worktop. Sebasten said that the worktop can only be measured after the cabinets are done. After the worktop is installed, the measurement of the glass splashback can then be done and install.





Our Bellari Hob is still in the box waiting for the worktop. The Bellari Hood and sink had been installed. Sebasten wondered why there is 3 holes on the sink and I told him the left is for the spray, center is for the tap and right is the detergent dispenser. He said that he didn't know that we bought the extra spray as he think it is not useful as our sink is small and water may drip below. Anyway I didn't explain that I need the spray to clean both the sink and washing machine. :P





The cabinet at the food preparation area aka pantry area.





The 2 tier dish rack is installed above the sink. It is not a big one due to the size of our sink but I guess it is enough of us. It is not like I am going to have 10 children ha ha ha.





The cultery tray is still in plastic bag. Not wanting to dirty it. :P
The drop door on the right is under the Hob. It is used to store all our pots and pans.