Sunday, December 14, 2008

Curtains

All the curtains are up. Day and night curtains for the living room.



Day and night curtain for the Master bedroom. We made mistake to do both day and night for the aircon ledge window. Should just do night curtain to save $$.



Night curtain for the 2 bedrooms.

Refrigerator

Our Fisher & Paykel Refrigerator which was delivered on 13 dec. Hmmm... feel that we over kill by buying such a big fridge. :P

Arrival of Furniture

A very tiring day.... 13 Dec was a day full of deliveries. All the furniture are scheduled to deliver today. The 1st was the bed which scheduled from 9am to 1pm. Follow by Refrigerator from 12pm to 3pm, sofa and coffee table from 1pm to 4pm, bed frame and dining table and side table from 2pm to 5pm.



Our Sofa, Coffee Table and Side Table.



Our display set Dining Table.



Our Bed Frame, Side Table and Bed.

In the end, not all deliveries was delivered on the scheduled timing. The 1st to arrive was bed, followed by sofa, bed frame, dining table, side table, refrigerator and lastly coffee table.

Kitchen Splashback

Finally, the last item is up. Our kitchen splashback is white in color. What's left are the touch up painting, varnishing the doors and filling up the gaps between the tiles.

Monday, December 8, 2008

Our Bellari gas hob finally came out of the plastic bag. Not the conventional hob, it is tornado which give more heat than conventional hob at the cost of more gas I believe.



Our Samsung washing machine delivered on Saturday although I had called to change the delivery to 13 Dec. Sad that the washing machine is higher than the cabinet. Luckily we bought a good looking one or else....

Mirror Mirror on the wall...

Mirror mirror on the wall, who's the fairest of them all. The mirrors on top, bottom and side of the shoe cabinet are fixed up.



The tinted mirror at the dining area. Feng shui said it is good to reflect on the dining table as it doubles the food which signifies abundance.